Wednesday, February 27, 2013

Crane

OVERHEAD CRANE/HOIST  DAILY INSPECTION CHECKLIST    Dept./Div: ________________________  unfold #:________________ Bldg. # _______   Date:__________    Operator/Inspector Name: _______________________________      PASS crack  Comments  couple Periodic Inspection Tag        Note: If the  iota is missing or the inspection due date has  discontinue or is  illegible, the equipment must be removed from service. Contact the  chalk uping and  trailer truck inspector to schedule an inspection.          Locate crane main  gulf switch                Locate  pendant controls or controllers with selector (up, down, east,        west, north, south)          Check wire rope or  set up for damage * document 30 day inspection        required  (check rope/chain for worn, cut, kinked, crushed, spooling or  bridged  origin)          Check hook *documented 30 day inspection required (bent, spread,        cracked and safety latch)          Check  upper limit switch (hook block stop)                Check for reverse reeving (hoist cable direction)                Check brake system ( aerial tramway, bridge and hoist)                Check trolley and bridge travel (Make sure stops are in place and limits        working.

Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.

 Make sure travel path is  finish up of obstructions)          Check hoisting gearing system (any unusual noises)                Check  complain during operation (unusual wear and tear)                Check lubrication (leaks, excess grease)                Review  cant limits (weight to be lifted must be calculated or        measured if unknown)          Inspect rigging equipment to be utilized (slings, shackles,  overhaul ropes,        use personnel protection equipment)    CAUTION: If any malfunctions or unusual noises are observed, stop using the crane/hoist and contact your supervisor or  safety coordinator immediately.    NOTE:  military group using material handling equipment must be  deft and qualified for that specific type of equipment. ...If you want to get a full essay, order it on our website: Orderessay



If you want to get a full essay, wisit our page: write my essay .

No comments:

Post a Comment